Thursday, December 23, 2010

Hooray for Holidays

It's almost holiday time again with only a half day to go before the Salt Mine sends the minions away for a well earned rest. I'll be taking the public holidays and returning for 3 days next week before taking off for 3 whole weeks. And, importantly, I've been guaranteed some train time....how good is that? Nothing like a long break from the Salt Mine and some train time to erase any memories of salt extraction. Hopefully, I'll have forgotten everything by the time I get back and they'll need to retrain / reprogramme me.

Since the last update, I've been a bit slack but I've still been able to do a little bit in between parties, lunches and family. I've finished the five points necessary for Hill Top including the power feeds so all the track is ready to lay for the top deck that's been built so far. I've also cut all the extruded polystyrene for the parts that need it but still have to glue it down. All the cork underlay is also ready for gluing so the plans for the holidays is to get everything glued down and build the embankments and grades for the leads into Hill Top. Then, it'll be lay the track and complete the power feeds under the deck and install the point motors and magnetic uncouplers. With a bit of luck, hopefully it will all go together and won't need much trouble shooting....I'm an optimist you know.

Also, I received a stack of information on Hill Top and Thirlmere from ARHS Resource Centre which included a plan and colour chart for the weatherboard Station Officers residence at Hill Top. Pure Gold and will be enough to build a reasonable model of the residence barring any incompetencies from you know who. Unfortunately, nothing turned up regarding the platform structures but the researchers did indicate that they felt the main waiting room was a single roomed structure scaled down from Thirlmere. Looks like some guestimation will be required to get something built....at least no-one will be able to say "It's too long" or "It's too short".

That's it for me for 2010 and so far, I think it's been a fairly productive year. Things haven't moved as fast as I would have liked but reality has to be squeezed in between train time. Them's the breaks as they say.

So all you Ferro Equinoligists out there, have a splendid Christmas and I hope you've all been very good boys and girls and Santa brings you lots of goodies.
For everyone else who doesn't like trains......too bad.
Only joking, hope you all have a very Merry Christmas and a prosperous New Year.

See you all in 2011 for more adventures in the wacky world of Early 20th Century NSW Railway Modelling.

Sunday, November 28, 2010

Pointy Stuff

Looks like the Salt Mine has got to me again. New job and new challenges have meant that train time hasn't been as much as it usually is as the Salt Mine demands much focus and pounds of flesh. Anyway, no use whinging.....no-one listens anyway. Also, being Christmas, the Vendors are showering me with lurve in the form of parties and drinkies and add to that family, you see why I haven't been getting much done. It's probably good to have a bit of a break now and then so when you get back to it, you have that much more enthusiasm.
Point building continues and I've nearly completed one with the just the guard rails and power feeds to go. Here's how it looks

A #6 Point for Hill Top

I'm reasonably happy with it so far and it should look Ok once all the rail is painted and weathered. Hopefully, there won't be too many mechanical issues with it. I guess I won't really know until it's installed and carrying traffic. So I've now only got another 8 to go................................. Remember how I was saying I wanted to have something running by Christmas, well given it's under 4 weeks away, I reckon my chances of making that happen are pretty slim. Maybe I'll get it together in my January holidays, we'll see.
Lastly I thought I'd post a shot of something different, Elscotto's 60ft Sellers turntable that he started for me. Here's a shot of it


This will become Picton's Turntable

I've also enlisted the help of the ARHS Resourcing Centre to look for plans of Hill Top and Thirlmere for when I can start building the station layouts. Looking forward to what they can turn up and once I get the track built, I can start on the intersting stuff...sometime in 2020.

Sunday, November 7, 2010

On Track

Work on the tracks continued this weekend with all the track, except the points, gapped, fishplated and painted. I also soldered all of the electrical feeds to each individual track section / panel with dual feeds on the longer sections. I also made small razor saw cuts on the rail heads to represent the gaps between individual rails and then glued fish plates to the sides of the rails. I then painted the track with Floquil Rail Brown but will follow up with some highlights of rust etc here and there to give some contrast. I've only detailed and painted the viewable side of the rail as there's not point wasting any more time on track that will never be seen. Any way here's how its turned out so far,

The rail brown looks a different shade in real life

More contrasts will make it look better I think

I picked up some Extruded Polystyrene Board from Foamex in Revesby so I can build up the height of Hill Top so I can have the mainline ascend up to the level of the down refuge.

And a big thanks to Linton for sending me a whole bunch of plans for Picton Station, Stonequarry Creek Viaduct, the Engine Shed and Goods Shed. This should spur me on to get the top deck up and running as I'm really looking forward to getting stuck into something aside from track. I probably should take a break from the track but I just want to get it done so hopefully, it won't take too much longer.

Sunday, October 24, 2010

Time is Not on my Side

I don't know about everyone else, but I just can't seem to get enough time to spend on my modelling. And it doesn't help that some of the tasks are very time consuming...like spiking rail to sleepers. I try to spend an hour and a half each weekday night with the occasional day on the weekend in the garage so I'd be interested to see what everyone else does.
I've finished spiking the rail on the approaches to Hilltop plus all of the sidings and built myself a catch point for the refuge on the down side of the mainline. I've run out of sleepers at the moment so I'll have to wait for Mr Postman to deliver my order from Model Railroad Craftsman 
Elscotto came round during the weekend and dropped off a 60ft Sellers turntable he'd put together for Picton, thanks mate. Elscotto also pointed out that the down refuge I mentioned before, was actually level, while the mainline dropped down the hill beside it so it's actually on the top of the cutting. Luckily Elscotto spotted it otherwise stupid me would have built it all on the level. So, I'll now have to raise the level of Hill Top to give me the ability to drop the mainline alongside the refuge rather than dropping the grade at the end of the refuge as I'd originally planned.
That's it for this week so I'm not going to speculate on what I think I'll be doing as I've noticed that every time I say I'm going to do something, I never get around to doing it.
If I make some progress this week, I'll put some photo's up otherwise I'll wait until I've got something to show.

Sunday, October 10, 2010

The Sun Never Sets on Hill Top

Looks like I haven't posted anything for a while so I better make amends and give an update on what's been happening.
It's been slow going with the track work as I haven't had as much time available to me as I normally do due to school holidays, jobs around the house, Liverpool exhibition and fixing my brother's computer. Oh, and a NRL Grand Final.....Go you Dragons!!!!!
Aaah, that's better.
Anyway, I've soldered up all the frogs and bolt details for the points and have spiked most of the track for Hill Top so this week I should start painting the rail after I solder the electrical feeds. The Kadee #309 magnetic uncouplers I ordered sometime ago for Hill Top arrived which I have to install and I've also ordered some Cobalt point motors from DCC Concepts which I'll need before mounting the points on the baseboard. I've also been trying to work out the dimensions and interior layout of the Hill Top station buildings so I posted some questions in the usual forums. The responses to these questions and others I've had have been fantastic (Thanks Pete, John and Evan amongst others) and the information I'm receiving is helping immensely.
So, here's how Hill Top is looking at the moment

The Track is not fixed yet

I also filled all the gaps and painted the backdrop for the so far completed layout. I took the easy way out and painted it sky blue but I did consider painting it grey. Picton will be set in winter hence the thought about painting it grey. Anyway, it's blue now and I'll probably add some clouds after seeing Geoff's efforts on his blog . It will always be sunny in Hill Top!
Here's a view of most of the layout so far.

The exercise bike must go

Just a little bit of a ramble on Liverpool. For me, each year just keeps getting better and better and not because of the layout quality but because of the people you talk to. Elscotto and I ventured out on the Saturday and I met some of his friends plus caught up with Ian at the Coff's Harbour Railway Modeller's Layout. I had the pleasure of seeing some of Ian's models, highlighted on his blog, trundling along behind a D55. Let me tell you they look better in real life....fantastic work. Also caught up with James from AMRM and thanked him for his photographic efforts of my models in the latest AMRM. The models look better in the photo's than they do in real life so thanks James.

That's it for now

Sunday, September 19, 2010

The Tracks of my Tears

Well, the track laying is going sloooowly as I'm now spiking the rails down after gluing with Pliobond. It's driving me crayzee I must admit so it better be worth the effort. The bullhead rail and chairs arrived so I've put all the chairs on the rails ready for gluing. The rail is code 75 and the chairs are 4mm but the ballast will come up to about half way up the rail so the scale and rail size shouldn't be noticeable. This will be installed as Hill Top's loop. I also purchased some Uneek point rodding, adjusters and balancers which unfortunately, were not what I expected. The rodding and rodding chairs are OK but the adjusters and balancers are cast in relief so they won't be making it onto the layout. Instead, I ordered some etched 4mm parts from the guys at Wizard so we'll see how they look. Hopefully, the scale won't be too noticeable. There's a lesson here.....never, ever procrastinate when buying stuff. I was about to buy the rodding and ancillaries from IR Models when Ian shut down the business. Damn!! Hence the search now for suitable replacements. With a bit of luck, Ian will find a new owner for his etches and I'll be able to get what I need. God knows what I'm going to do for signals if this doesn't happen.
In the meantime, to keep myself from going mental, I built some backdrops for the layout out of 3mm ply. Here's how it looks

Near the roller Doors

The Other end

I've also ordered some Kadee uncoupler magnets for when I finally get to install the track and points. That is if I don't lose my mind in the meantime.

Sunday, August 29, 2010

Rob The Builder

It's been a busy week this week with quite few things started and finished in the train room. I mentioned in the last post about making a module for the upper and lower decks near the roller doors. It's mostly completed with just the top deck to go and the backdrops to be added. I also built 3 book cases to store my kits, tools and magazines. Here's a photo of the module


And here's one of the bookcases


I've still got to sand them and then they can be painted and then all of my stuff can be brought in. I'll probably have to build some more to hold everything but at approximately $25 each, it's not going to break the bank
The track work continues and I've started on the points needed for Hill Top and Thirlmere. I had started by gluing the sleepers to templates but the glue didn't hold the sleepers so I had to do it again.  Modelling is sooo much fun when you do everything twice. I've done 8 points and have glued down all the track plates and have glued the straight rail down with the rest to follow this week with luck. Here's 2 of the points.


Still a fair bit to go but I've set myself a target to have trains running by the end of the year.....we'll see how that goes.